First orbit raising operation of GSAT-6 completes successfully

After successful launch of GSAT-6, the country’s latest communication satellite into a Geosynchronous Transfer Orbit, Indian Space Research Organisation today said it has performed the first orbit raising of the satellite.

First orbit raising operation of GSAT-6 completes successfully

After successful launch of GSAT-6, the country’s latest communication satellite into a Geosynchronous Transfer Orbit, Indian Space Research Organisation today said it has performed the first orbit raising of the satellite.

“First orbit raising operation of GSAT-6 was successfully completed by firing the Apogee Motor for 3385 seconds at 08:35 hrs IST on August 28,” ISRO said.

Realised orbit is 8,408 km (perigee height) by 35,708 km (apogee height) with an inclination of 7.5 degree and an orbital period of 13 hours, 15 minutes and 24 sec, it said.

Forests are connected to nearly every aspect of sustainability. Depleting forest cover accelerates climate change, impacts wildlife, significantly reduces land quality, leads to an increase in soil erosion, and consequent runoffs. (Image:- Pixabay)
International day of forests: Collaborative effort to help save our forests
isro, isro gaganyaan, isro gaganyaan astronaut, isro astronaut training, gaganyaan crew members, gaganyaan crew members training
Who are the 4 astronauts selected for ISRO’s Gaganyaan Mission announced by PM Modi
cattle population in India, Livestock Census, agrarian distress, Gir cattle, Zebu’ breeds, female cattle population
The Indian cattle breed behind the white revolution in Brazil
Four Astronauts
Gaganyaan Mission: Meet the Indian Astronauts Ready to Soar into Space

ISRO on Thursday had successfully launched GSAT-6, having an indigenous cryogenic engine, on-board the GSLV-D6 rocket from the spaceport at Sriharikota.

Soon after its injection into GTO, the two solar arrays of GSAT-6 were automatically deployed and the Master Control Facility (MCF) at Hassan in Karnataka took control of GSAT-6, ISRO had said after the launch.

In the coming days, GSAT-6’s orbit will be raised from its present GTO to the final circular Geostationary Orbit (GSO) by firing the satellite’s Liquid Apogee Motor (LAM) in stages, it had said.

The satellite will be commissioned into service after the completion of orbit raising operations, deployment of its 6 m wide sieve shaped unfurlable antenna, the satellite’s positioning in its designated orbital slot of 83 degree East longitude in the GSO and in-orbit testing of its communication payloads.

GSAT-6 is the 25th geostationary communication satellite of India built by ISRO and 12th in the GSAT series. It provides communication through five spot beams in S-band and a national beam in C-band for strategic users.

The cuboid shaped GSAT-6 had a lift-off mass of 2117 kg. Of this, propellants weighed 1132 kg and the dry mass of the satellite was 985 kg at the time of launch.

Get live Share Market updates, Stock Market Quotes, and the latest India News and business news on Financial Express. Download the Financial Express App for the latest finance news.

First published on: 29-08-2015 at 16:15 IST
Market Data
Market Data
Today’s Most Popular Stories ×