Rotate your tablet
for a better experience
Latest news
- By categories
-
By date
-
By reading time
The Ariane 6 central core and two boosters for the first flight are now joined together
The teams at Europe’s Spaceport in Kourou, French Guiana, have carried out all the mechanical connections in order to join…
Start of first Ariane 6 launch campaign on the launch pad
The central core and two boosters of the first flight Ariane 62 launcher are now together on the launch pad at…
Alert
Do not miss an article. Subscribe to our alerts.
Hot-fire tests of the Ariane 6 stages: an overview
The purpose of the Ariane 6 combined tests campaign at Europe’s Spaceport in Kourou was to check the working of the…
Ariane 6 meets Ariane 6
Two Ariane 6 launcher central cores are together for a short period in the Launcher Assembly Building at Europe’s Spaceport in…
First booster for the Ariane 6 inaugural flight is ready
A further step on the way towards the first Ariane 6 flight: ArianeGroup teams have completed integration of the first booster…
The central core for the first Ariane 6 flight is taking shape
The main stage and the upper stage for the first Ariane 6 flight arrived at Europe’s Spaceport in French Guiana on…
Ariane 6’s journey to space begins at sea
The core stage and the upper stage for the first Ariane 6 flight launcher are on board the Canopéé sailing ship…
ArianeGroup + Elixir™ revolutionizing industrial waste management
Elixir™, set up in 2017 by ArianeGroup as a waste disposal facility offering a cleaner option to traditional incineration technologies,…