spacetoday.net: space news from around the webin association with SpaceNews


NASA plans gap filler repair after successful gyro work
Posted: Tue, Aug 2, 2005, 5:32 AM ET (0932 GMT)
STS-114: EVA 2 (NASA) Hours after astronauts successfully replaced a gyroscope on the International Space Station, NASA officials said late Monday that spacewalkers would attempt repairs to "gap fillers" on the underside of shuttle Discovery later this week. According to the current plan, astronaut Steve Robinson, attached to the end of the shuttle's robot arm, will venture to the underside of the orbiter and pull out or cut two gap fillers protruding from between tiles there. Engineers are concerned that the gap fillers, made of ceramic cloth, could disrupt the flow of air during reentry, creating turbulent heating that could damage the orbiter. The repairs will take place during a previously-scheduled EVA planned for Wednesday. That decision came after Robinson and Soichi Noguchi completed the second spacewalk of the mission. During that EVA the two astronauts replaced a failed gyroscope on the ISS that provides attitude control for the station.
<<previous article   next article>>
news in brief
Pentagon dismisses $1.2 trillion cost estimate for Golden Dome
Posted: Sat, May 16 9:36 AM ET (1336 GMT)


Kinetica-1 launches five satellites
Posted: Sat, May 16 9:30 AM ET (1330 GMT)

news links
Wednesday, May 20
Vega C Deploys ESA-China Smile Satellite
Aviation Week — 4:28 am ET (0828 GMT)
Sandhoo Becomes U.S. SDA Leader And Space Force PAE
Aviation Week — 4:25 am ET (0825 GMT)
Peterson needs more room for workers, as Space Force plans to double in size
Colorado Springs Gazette — 4:25 am ET (0825 GMT)


about spacetoday.net   ·   info@spacetoday.net   ·   mailing list